Essays about: "House module manufacturing"
Showing result 1 - 5 of 6 essays containing the words House module manufacturing.
-
1. Implementation and standardization of vibration measurements in strip production processes
University essay from Högskolan i Gävle/ElektronikAbstract : Within the era of the fourth industrial revolution the steel production industry is faced with demands of lower environmental impact and more cost-effective production are some of the challenges faced. To achieve more sustainable and efficient manufacturing processes companies try to digitalize and automate their production to a greater extent. READ MORE
-
2. Design-Manufacturing Integration : Challenges in change management for new component in-house manufacturing
University essay from KTH/Maskinkonstruktion (Inst.)Abstract : In the highly competitive transportation industry, one way to gain a competitive advantage is to ensure the customer needs are satisfied and tailored according to each customer’s need. Scania’s one of the core values is customers first and believes that the organization is successful only when its customers are successful. READ MORE
-
3. The Future of the Sub-Factory : A change project at Lindbäcks Bygg AB
University essay from Luleå tekniska universitet/Institutionen för ekonomi, teknik och samhälleAbstract : This is a master thesis in Industrial design engineering at Luleå University of Technology. The project was carried out between August 2017 and January 2018. The thesis is done at Lindbäcks Bygg AB in Piteå. Lindbäcks is a manufacturer of wooden apartment buildings. READ MORE
-
4. Weld Producibility Assessment System : Evaluation of Producibility Assessment tools using Set-based approach in Multi-disciplinary Aerospace Design
University essay from Högskolan i Jönköping/JTH, ProduktutvecklingAbstract : This thesis is a continuation of design automation studies within research projects financed by VINNOVA (the Swedish Governmental Agency for Innovation Systems) and Knowledge foundation that contributed to the development of producibility assessment system at a global aerospace products supplier, GKN Aerospace Sweden. A case study was carried at the company on Turbine Rear Structure (TRS) component design of a jet engine with the main objective to evaluate weld producibility assessment tools and to demonstrate system’s performance in multi-disciplinary design environment. READ MORE
-
5. Outsourcing versus in-house production : Development of a make-or-buy decision model at Atlas Copco Rock Drills AB
University essay from Linköpings universitet/Industriell ekonomi; Linköpings universitet/Tekniska fakultetenAbstract : The question regarding whether to produce in-house or to purchase from an external supplier is nowadays commonly highlighted as a central and strategic decision for manufacturing firms. Furthermore, the importance of creating a competitive and consistent make-or-buy strategy that is adapted to the context of the firm as well as to today´s dynamic business environment cannot be underestimated. READ MORE