Department of Real estate and Construction management

University essay from KTH/Fastigheter och byggande

Abstract: In Sweden there is a situation where buildings are constructed at a relatively low rate, while the need for more households is growing relatively quickly. In this thesis the following surveys are conducted; we want to investigate the time required for each process, how the number of building permits for each plan evolve during the process and the number of investigations carried out in connection with the process. The hypothesis is that the developers want to get as many development rights as possible. However, it is the municipality's responsibility to test the suitability of the project in accordance with the law and guidelines which can result in fewer development rights than the builder's preference in the final detailed plan. We have examined 32 plans and concluded that the number of development rights does not drop during the process. Some of the investigations necessary are determined by law, while in some cases by the municipality require various additional studies for a project to be carried through. The survey shows that the number of investigations is approximately 3 per studied plan. The average time spent has been more than 2.5 years for all studied plans. The results of this study indicate that there may be a correlation between the numbers of building permits; the number of investigations and the time required for each process, further studies on this topic are invited.

  AT THIS PAGE YOU CAN DOWNLOAD THE WHOLE ESSAY. (follow the link to the next page)