Essays about: "4D BIM"

Showing result 1 - 5 of 7 essays containing the words 4D BIM.

  1. 1. 4D BIM ADOPTION : THE INCENTIVES FOR AND BARRIERS TO 4D BIM ADOPTION WITHIN SWEDISH CONSTRUCTION COMPANIES

    University essay from KTH/Fastigheter och byggande

    Author : Mujtaba Sediqi; [2018]
    Keywords : 4D BIM; 4D Planning; Construction Project Management; Scheduling;

    Abstract : Sweden is perceived to be one of the Building Information Modeling (BIM) leaders in the world. However, studies have shown that 4D BIM, which is a combination of a 3D model and an associated time schedule, is not widely deployed in construction planning practices among contractors. READ MORE

  2. 2. Construction Labour Productivity Botrygg Case Studies

    University essay from Chalmers tekniska högskola/Institutionen för arkitektur och samhällsbyggnadsteknik

    Author : Aryan Maarof; Shamim Easeph; [2017]
    Keywords : Labour productivity; Benchmarking; Work Sampling; Botrygg Bygg; PMI.;

    Abstract : The construction industry in general is a labour centric industry. Labour productivity is a critical factor that determines the success of a construction project. Many researches have pointed out the labour productivity is dependent on working conditions, quality of management and technology. READ MORE

  3. 3. Planning for Efficiency at Karlatornet

    University essay from Chalmers tekniska högskola/Institutionen för bygg- och miljöteknik

    Author : Oskar Andersson; Simon Månsson; [2017]
    Keywords : Lean construction; High-rise construction; Push and pull; Location-based planning; Just in time; 4D BIM; and Virtual design and construction.;

    Abstract : Construction of high-rise constructions has during past decades seen an incrementalincrease, which is now also evident in the Swedish market with the forthcomingconstruction of Karlatornet at Lindholmen in Gothenburg. When constructing high-riseconstructions new constraints are imposed, connected to height and limited space ateach floor, which calls for planning methods adapted for the challenges that emerges. READ MORE

  4. 4. Detecting and resolving work-space conges-tions and time-space conflicts through 4D - Modeling in the Micro level

    University essay from KTH/Fastigheter och byggande

    Author : Zhang Zengshiting; [2016]
    Keywords : BIM; 4D; Construction; Work-space conges-tion; Time space conflict; Location lag; Flowline scheduling;

    Abstract : This degree project aims to find solutions to prevent construction process from delay by detecting and resolving work-space congestions and time-space conflicts based on 4D-modeling.The purpose is to improve the work efficiency on the construction site of a hospital project. READ MORE

  5. 5. IMPACT OF 4D MODELING ON CONSTRUCTION PLANNING PROCESS

    University essay from Chalmers tekniska högskola/Institutionen för bygg- och miljöteknik

    Author : Moiz Tarar; Dung Thi Puong Dang; [2012]
    Keywords : 4D modeling; 4D planning; 4D BIM; construction planning; planning methods;

    Abstract : .... READ MORE