Essays about: "4D Planning"
Showing result 1 - 5 of 7 essays containing the words 4D Planning.
-
1. Inclusion of more sources in a commercial brachytherapy Monte Carlo
University essay fromAbstract : Brachytherapy is a cancer treatment method where a solid radioactive source is placed inside the body in order to target cancer cells with a high dose of radiation while minimizing damage to surrounding healthy tissue. The most common method for treatment planning in brachytherapy is the TG43 formalism where the whole patient geometry is treated as water. READ MORE
-
2. Development and implementation of 4D modeling in a Gigafactory
University essay from KTH/Skolan för industriell teknik och management (ITM)Abstract : The auto manufacturing industry has experienced a shift towards a lower carbon trajectory, resulting in new fleets of electric vehicles. The trajectory has put the supply chain in motion and the demand for lithium-ion batteries has increased significantly. READ MORE
-
3. The Wake Effect and Wind Farm Clustering
University essay from Lunds universitet/Institutionen för energivetenskaperAbstract : The wind energy industry is growing rapidly and as offshore wind expands in the Baltic sea, more and more clusters will be observed. The purpose of this work is to better understand the impact that wakes have on the electricity production for wind farm clusters in the Southern Middle Bank region. READ MORE
-
4. Clinical implementation of 4D Guidance during lung cancer treatment with radiation therapy
University essay from KTH/Medicinteknik och hälsosystemAbstract : Radiotherapy is one of the main treatment for lung cancer. This technique relies on killing the tumor cells by focusing electron or photon beam in the area. READ MORE
-
5. 4D BIM ADOPTION : THE INCENTIVES FOR AND BARRIERS TO 4D BIM ADOPTION WITHIN SWEDISH CONSTRUCTION COMPANIES
University essay from KTH/Fastigheter och byggandeAbstract : Sweden is perceived to be one of the Building Information Modeling (BIM) leaders in the world. However, studies have shown that 4D BIM, which is a combination of a 3D model and an associated time schedule, is not widely deployed in construction planning practices among contractors. READ MORE