  1. 1. Development and implementation  of 4D modeling  in a Gigafactory

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : SANDRA HEDLUNDH; FRIDA NYBERG; [2021]
    Keywords : ;

    Abstract : The auto manufacturing industry has experienced a shift towards a lower carbon trajectory, resulting in new fleets of electric vehicles. The trajectory has put the supply chain in motion and the demand for lithium-ion batteries has increased significantly. READ MORE

  2. 2. 4D BIM ADOPTION : THE INCENTIVES FOR AND BARRIERS TO 4D BIM ADOPTION WITHIN SWEDISH CONSTRUCTION COMPANIES

    University essay from KTH/Fastigheter och byggande

    Author : Mujtaba Sediqi; [2018]
    Keywords : 4D BIM; 4D Planning; Construction Project Management; Scheduling;

    Abstract : Sweden is perceived to be one of the Building Information Modeling (BIM) leaders in the world. However, studies have shown that 4D BIM, which is a combination of a 3D model and an associated time schedule, is not widely deployed in construction planning practices among contractors. READ MORE

  3. 3. Effect of Petrophysical Parameters on Seismic Waveform Signatures : Review of Theory with Case Study from Frigg Delta Oil Field, Norway

    University essay from Uppsala universitet/Geofysik

    Author : Gardar Gislason; [2016]
    Keywords : AVO; poroelasticity; AVFO; WIFF; seismic attenuation; seismic dispersion; AVO; poroelasticitet; AVFO; WIFF; seismisk dampning; seismisk dispersion;

    Abstract : Conventional AVO analysis has been used for the past 4 decades to aid in locating oil and gas reservoirs for extraction. It is, however, not possible to use it to acquire information on the porosity of the rock, the fluid saturation or other important petrophysical parameters. READ MORE

  4. 4. Detecting and resolving work-space conges-tions and time-space conflicts through 4D - Modeling in the Micro level

    University essay from KTH/Fastigheter och byggande

    Author : Zhang Zengshiting; [2016]
    Keywords : BIM; 4D; Construction; Work-space conges-tion; Time space conflict; Location lag; Flowline scheduling;

    Abstract : This degree project aims to find solutions to prevent construction process from delay by detecting and resolving work-space congestions and time-space conflicts based on 4D-modeling. The purpose is to improve the work efficiency on the construction site of a hospital project. READ MORE

  5. 5. Development and Evaluation of Novel Algorithms for Enhanced Aircraft Routing on Ground

    University essay from Göteborgs universitet/Institutionen för data- och informationsteknik

    Author : ACHILLEAS F KATSAROS; [2012-04-10]
    Keywords : ;

    Abstract : The process of Aircraft Routing on Ground corresponds to the surface movement of aircraft on an airport’s taxiway network, from a runway exit to a parking stand (arrivals) and from a parking stand to a runway entrance (departures). Given such a pair of terminal points and depending on the taxiway network structure, there can be one or more alternative routes that the aircraft can follow to its destination. READ MORE