Essays about: "AHP MANAGEMENT"

Showing result 1 - 5 of 35 essays containing the words AHP MANAGEMENT.

  1. 1. ASSESSMENT OF WIND POWER PROJECTS: THE DEVELOPMENT OF A METHODOLOGY FOR EARLY-STAGE EVALUATION

    University essay from Uppsala universitet/Institutionen för geovetenskaper

    Author : Ilya Ibraheem; [2023]
    Keywords : Wind Power; Wind power project management; MCDM; AHP;

    Abstract : There is limited land accessible for the construction of wind farms due to the obstacles posed by geographical constraints, popular opposition, wildlife conservation, and power system integration. These variables make the planning of wind power projects a complex procedure requiring the consideration of numerous criteria and limits. READ MORE

  2. 2. Develop a Process for the Selection of New Continuous Improvement Projects : A case study of the prioritization of Lean Six-Sigmain the quality management team in an assembly industry through the AHP method

    University essay from Mälardalens universitet/Akademin för innovation, design och teknik

    Author : Roopa Attibele Prakash; Adeleh Edalati; [2023]
    Keywords : CI Projects; MCDM methods; AHP; FMEA; Project Prioritization;

    Abstract : The research focuses on the selection and prioritization of Continuous Improvement (CI)projects in organizations. This study emphasizes the importance of recognizing appropriatecriteria for selecting projects that align with an organization's needs, skills, and goals. READ MORE

  3. 3. Ranking Software Reliability Measures using Best Worst Multicriteria DecisionMaking Method

    University essay from Blekinge Tekniska Högskola/Institutionen för programvaruteknik

    Author : Venkat Puneeth Reddy Mereddy; [2023]
    Keywords : Ranking Software measures; Software reliability; Multi-criteria Decision making; Best Worst Method. ii;

    Abstract : Background: The production of high-quality software products has been a long-standing challenge for the software industry. The advent of agile software development methodologies has resulted in a significant acceleration in the development pace. READ MORE

  4. 4. Determination of a hydropower "go-to area" : Klarälven and Dalälven potential assessment and environmental regulation constraints

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : Paula Aparicio Garcia; [2023]
    Keywords : Hydropower; REPowerEU; Go-to areas; GIS; MCDA; AHP; RED II; WFD; Nature 2000; Vattenkraft; REPowerEU-Planen; Go-to area; GIS; MCDA; AHP RED II; WFD; Nature 2000;

    Abstract : The current energy crisis with sky-rocketed prices has created the need for new sustainable solutions in the energy production sector. The REPowerEU Plan, presented by the European Commission, has taken up on this and has established measures to accelerate the introduction of new renewable energy capacity in Europe, such as the designation of “go-to areas” by Member States to shorten authorization permits in areas with high potential and low environmental impacts. READ MORE

  5. 5. What is the optimal way of choosing projects within complex decision-making?

    University essay from

    Author : Simon Eklind; Olle Enelund; [2021-06-28]
    Keywords : ;

    Abstract : This essay has investigated Analytical Hierarchy Process (AHP) and whether it has potential to be used as an algorithm within the project selection process. The aim of the study has been to highlight the most important aspects to take into consideration in project evaluation and if AHP could be a feasible method within project selection. READ MORE