Essays about: "COCOMO II"

Found 4 essays containing the words COCOMO II.

  1. 1. Software Development Cost Estimation Using COCOMO II Based Meta Model

    University essay from KTH/Industriella informations- och styrsystem

    Author : Alexander Hjalmarsson; [2013]
    Keywords : ;

    Abstract : Large amounts of software are running on what is considered to be legacy platforms. These systems are often business critical and cannot be phased out without a proper replacement. READ MORE

  2. 2. Exploring the Accuracy of Existing Effort Estimation Methods for Distributed Software Projects-Two Case Studies

    University essay from Blekinge Tekniska Högskola/Sektionen för datavetenskap och kommunikation

    Author : Abid Ali Khan; Zaka Ullah Muhammad; [2009]
    Keywords : Effort Estimation; Global Software Development GSD ; COCOMO II; SLIM; ISBSG;

    Abstract : The term “Globalization” brought many challenges with itself in the field of software development. The challenge of accurate effort estimation in GSD is one among them. When talking about effort estimation, the discussion starts for effort estimation methods. There are a number of effort estimation methods available. READ MORE

  3. 3. Investigating the Nature of Relationship between Software Size and Development Effort

    University essay from Blekinge Tekniska Högskola/Avdelningen för för interaktion och systemdesign

    Author : Sohaib-Shahid Bajwa; [2008]
    Keywords : Software Effort Estimation; Functional Size Measurement; COSMIC Functional Size; ISBSG Data Set;

    Abstract : Software effort estimation still remains a challenging and debatable research area. Most of the software effort estimation models take software size as the base input. Among the others, Constructive Cost Model (COCOMO II) is a widely known effort estimation model. It uses Source Lines of Code (SLOC) as the software size to estimate effort. READ MORE

  4. 4. Applying COCOMO II : A case study

    University essay from Blekinge Tekniska Högskola/Avdelningen för programvarusystem

    Author : Darko Milicic; [2004]
    Keywords : software; time; effort; cost; estimation; COCOMO;

    Abstract : This thesis presents the work based on the software cost estimation model COCOMO II, which was applied to a case study object derived from a software organization that had a completed project at its disposal. One of the most difficult phases in software development is the planning process and the ability to provide accurate cost estimations for a project. READ MORE