Essays about: "Capacitated Lot Sizing Problem with Sequence Dependent Setup Times SLSP-SDST"

Found 1 essay containing the words Capacitated Lot Sizing Problem with Sequence Dependent Setup Times SLSP-SDST.

  1. 1. Optimization of Production Scheduling at IKEA Industry Hultsfred

    University essay from Linköpings universitet/Kommunikations- och transportsystem; Linköpings universitet/Tekniska högskolan

    Author : Mattias Anemyr; [2020]
    Keywords : Capacitated Lot Sizing Problem with Sequence Dependent Setup Times SLSP-SDST ; Production Scheduling; Weighted Sum Method;

    Abstract : IKEA Industry has factories in several locations where one location is in Hultsfred, Småland. IKEA Industry Hultsfred produces IKEA:s wardrobe collection PAX. In 2018, 2.8 million wardrobes were manufactured in Hultsfred. READ MORE