Essays about: "CiP"
Showing result 1 - 5 of 21 essays containing the word CiP.
-
1. Fouling modelling in a UHT unit based on plant data.
University essay from Lunds universitet/Livsmedelsteknik och nutrition (master)Abstract : Heat treatment of dairy products is essential for food safety, one way to perform this is ultra-high temperature (UHT) processing. During the process, macronutrients and minerals form fouling deposits which impairs heat transfer. Eventually the fouling needs to be removed chemically by alkaline and acidic detergents. READ MORE
-
2. Full Material Declaration - A case study on the readiness for declaring Full Material Declaration of chemical substances in components, used in finished products
University essay from Lunds universitet/Miljövetenskaplig utbildning; Lunds universitet/Centrum för miljö- och klimatvetenskap (CEC)Abstract : The production and use of chemicals has grown exponentially over the past 50 years. Although the knowledge of hazards and risks associated with chemicals towards humans and the environment has increased, we know frightenedly little about how dangerous these might become when part of finished products. READ MORE
-
3. Preparation and characterization of translucent glass ceramics
University essay from Uppsala universitet/Tillämpad materialvetenskapAbstract : The purpose of this thesis is to prepare and characterize translucent glass ceramics. The procedure was as follows, first a general background of the field is presented where the problems with current dental glass ceramics are presented, together with their history. The need for a stronger material is then clarified with the addition of new metals. READ MORE
-
4. The Carry Trade: From 1990 to 2020
University essay fromAbstract : This thesis examines the carry trade movements from 1990 to 2020. The purpose is to evaluate how an actively managed carry trade has behaved during different market conditions. READ MORE
-
5. Optimisation of Planned Downtime Events
University essay from KTH/Hållbar produktionsutveckling (ML)Abstract : This thesis evaluates the product to product changeover process of the line S10 at the Coca-Cola European Partners manufacturing plant in Jordbro, Sweden. The target has been to propose improvements to reduce the total planned downtime by 10%. The total planned downtime in March of 2019 was 4449 minutes. READ MORE