Essays about: "HP model"

Showing result 1 - 5 of 50 essays containing the words HP model.

  1. 1. Energy System Analysis of thermal, hydrogen and battery storage in the energy system of Sweden in 2045

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : Poornima Sundarrajan; [2023]
    Keywords : VRES; Energy System Model; CEEP; Wind integration; Thermal Energy Storage; Hydrogen Storage; Heat Pumps; Electrolysers; VRES; Energisystemmodell; CEEP; Vindintegration; Värmeenergilagring; Vätgaslagring; Värmepumpar; Elektrolysörer;

    Abstract : Sweden has goals to reach net-zero emissions by 2045. Although electricity sector is almost fossil free, industry & transport still rely on fossil fuels. Ambitious initiatives such as HYBRIT, growth of EV market & expansion of wind power aim to expedite emission reduction. READ MORE

  2. 2. Flexible Sector Coupling (FSC) of Electrical and Thermal Sectors via Thermal Energy Storage (TES) : A Case Study on Oskarshamn Energi

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : Raúl Calvo García; Jose María Marín Arcos; [2023]
    Keywords : Flexible sector coupling FSC ; district heating DH ; thermal energy storage TES ; heat pump HP ; capacity optimization; dispatch optimization; open-access tools; Flexibel sektorkoppling; fjärrvärme; termisk energilagring; värmepump; kapacitetsoptimering; leveransoptimering; verktyg med öppen tillgång;

    Abstract : The integration of distributed energy sources and systems is of high relevance for the transition towards a more sustainable energy system. Taking into consideration the  amount of emissions produced by the heating sector, which account for at least half of the energy demand in buildings, district heating systems have the potential to play a key role in the transition, by enabling the integration of various energy sources and provide flexible energy services to the grid. READ MORE

  3. 3. Sustainable Urban Energy Transition for the City of Bitola, North Macedonia : A City-Scale Urban Building Energy Model

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : Emilie Andersson; Hillevi Höijer; [2023]
    Keywords : Urban building energy model; UBEM; Urban energy simulation; Urban energy transition; City Energy Analyst; CEA; Bitola; North Macedonia; Byggnadsmodellering på stadsnivå; Stadsenergimodellering; Stadsenergiomställning; Urban Building Energy Model; City Energy Analyst; CEA; Energisystemmodell; Bitola; Nordmakedonien;

    Abstract : Cities play a crucial role in sustainable energy system transformation. Urban energy systems account for 75% of global primary energy use, and 70% of global greenhouse gas (GHG) emissions (IEA, 2021). READ MORE

  4. 4. Solar PV Integrated with Seasonal Thermal Storage and District Heating

    University essay from Lunds universitet/Institutionen för energivetenskaper

    Author : Lovisa Thalén; Hannah Ekström; [2023]
    Keywords : Solar PV; power-to-heat; heat pump; electric boiler; thermal seasonal storage; district heating; Technology and Engineering;

    Abstract : In order to contribute to reaching the climate goals of the future, power-to-heat (P2H) technologies are a possible solution. A heat pump (HP) or an electric boiler (EB) can be used to produce warm water by utilising cheap electricity from photovoltaic (PV) parks in the summer when there are many hours of sunlight. READ MORE

  5. 5. Standardization of layout routing using product development and process optimization: A concept study conducted at Quintus Technologies AB : Master thesis work 30 credits, Advanced level

    University essay from Mälardalens universitet/Akademin för innovation, design och teknik

    Author : Robert Haddad; Shwan Barzo; [2023]
    Keywords : Optimization; Standardization; Module; Structure; CAD-model; Layout routing; Optimering; Standardisering; Modul; Struktur; CAD-modell; Layout routing;

    Abstract : Moving from a project-based to a product-based organization comes with its own challenges, which goes for most organizations when one business model is changed to another. These changes lead to uncertainties in the work for the engineers, where lead time increases and time for the projects. READ MORE