Essays about: "Last Planner system"

Showing result 6 - 10 of 11 essays containing the words Last Planner system.

  1. 6. Investigation of Polynomial Trajectory Planner for Emergency Maneuver

    University essay from KTH/Maskinkonstruktion (Inst.)

    Author : LUDVIG BJÄRKEBACK; [2019]
    Keywords : ;

    Abstract : Getting an autonomous car to work is a complex task, and it is developed in steps. Today there are many semi-autonomous Advanced Driver Aid Systems in cars such as Adaptive Cruise Control and Lane Keeping Aid to improve comfort for the driver. READ MORE

  2. 7. Motion Planning for Parking a Truck and Trailer System

    University essay from KTH/Skolan för elektroteknik och datavetenskap (EECS)

    Author : Karl Kvarnfors; [2019]
    Keywords : ;

    Abstract : Motion planning for autonomous heavy vehicles has been an intensively studied topic during the last years. In particular, real-world applicable motion planning schemes for truck-trailer systems have emerged and several continuous-curvature local planners for nonholonomic vehicles have been conceived. READ MORE

  3. 8. Production Planning With the Last Planner System on Construction Projects in Sweden : An Exploratory Case Study of Challenges and Improvement Measures

    University essay from KTH/Fastigheter och byggande

    Author : Maria Dag; Apoorv Garg; [2019]
    Keywords : Lean Construction; Production Control; Last Planner system; Lean Construction; Production Control; Last Planner system;

    Abstract : One of the main assumptions in conventional production process is that each component or part of the production process can be controlled separately as if they are not dependent on anything. This assumption gives rise to problems such as need of effective collaboration with different actors and constraints in budgets. READ MORE

  4. 9. Detecting and resolving work-space conges-tions and time-space conflicts through 4D - Modeling in the Micro level

    University essay from KTH/Fastigheter och byggande

    Author : Zhang Zengshiting; [2016]
    Keywords : BIM; 4D; Construction; Work-space conges-tion; Time space conflict; Location lag; Flowline scheduling;

    Abstract : This degree project aims to find solutions to prevent construction process from delay by detecting and resolving work-space congestions and time-space conflicts based on 4D-modeling. The purpose is to improve the work efficiency on the construction site of a hospital project. READ MORE

  5. 10. Automation of periodic replenishment process for fashionable product

    University essay from KTH/Industriell produktion

    Author : Rémi Lauwerier; [2015]
    Keywords : ;

    Abstract : The thesis depicted in this report was the subject of my internship at Dior Haute Couture in Paris. I was a member of the supply chain team and I was working on the women shoes product. The aim was to develop the automation of the replenishment of the stores in the world. READ MORE