Essays about: "MCDM selection"

Showing result 1 - 5 of 12 essays containing the words MCDM selection.

  1. 1. ASSESSMENT OF WIND POWER PROJECTS: THE DEVELOPMENT OF A METHODOLOGY FOR EARLY-STAGE EVALUATION

    University essay from Uppsala universitet/Institutionen för geovetenskaper

    Author : Ilya Ibraheem; [2023]
    Keywords : Wind Power; Wind power project management; MCDM; AHP;

    Abstract : There is limited land accessible for the construction of wind farms due to the obstacles posed by geographical constraints, popular opposition, wildlife conservation, and power system integration. These variables make the planning of wind power projects a complex procedure requiring the consideration of numerous criteria and limits. READ MORE

  2. 2. Develop a Process for the Selection of New Continuous Improvement Projects : A case study of the prioritization of Lean Six-Sigmain the quality management team in an assembly industry through the AHP method

    University essay from Mälardalens universitet/Akademin för innovation, design och teknik

    Author : Roopa Attibele Prakash; Adeleh Edalati; [2023]
    Keywords : CI Projects; MCDM methods; AHP; FMEA; Project Prioritization;

    Abstract : The research focuses on the selection and prioritization of Continuous Improvement (CI)projects in organizations. This study emphasizes the importance of recognizing appropriatecriteria for selecting projects that align with an organization's needs, skills, and goals. READ MORE

  3. 3. Analysis of 3D design tools for tubing and piping design : Evaluating E3D and CATIA for on-machine tubing and piping design of paper machines using the analytic hierarchy process

    University essay from Karlstads universitet/Institutionen för ingenjörsvetenskap och fysik (from 2013)

    Author : Måns Lundskog; [2019]
    Keywords : ;

    Abstract : This thesis covers a degree project for a Bachelor of Science in mechanical engineering degree and is written on behalf of Valmet AB. The purpose of the project is to evaluate and analyse the differences between CATIA and E3D and conclude which of the software is most suitable for on-machine tubing and piping design at Valmet. READ MORE

  4. 4. Project evaluation in the energy sector: The case of wind farm development

    University essay from KTH/Skolan för industriell teknik och management (ITM)

    Author : Johanna Rahm Juhlin; Sandra Åkerström; [2019]
    Keywords : Project evaluation; wind energy projects; MCDM analysis; wind energy project economics; wind farm development; Projektutvärdering; vindkraftsprojekt; MCDM analys; utveckling av vindkraftsprojekt; vindkraftsekonomi;

    Abstract : Wind is a fast growing energy resource and the demand for clean energy is increasing with growing interests from media, governmental institutions and the public (EWEA, 2004). The increased interest towards the wind energy market has led to a more competitive environment where it is crucial for a project developer to select projects most likely to succeed, in terms of profitability, among alternatives on the market. READ MORE

  5. 5. Ranking suppliers by using the Sustainable Supplier Evaluation Criteria (SSEC) and Multi-Criteria Decision Making (MCDM) methods

    University essay from Linnéuniversitetet/Institutionen för ekonomistyrning och logistik (ELO)

    Author : Tallat Mehmood; Farnaz Khodabandeh; [2017]
    Keywords : ;

    Abstract : Background: Despite the competition for achieving lower costs and higher profits, companies are nowadays becoming increasingly aware of the environmental and social impacts of their operations. This is unveiled by growing numbers of sustainable activities in companies’ reports. READ MORE