Essays about: "Multi-active façade"

Found 3 essays containing the words Multi-active façade.

  1. 1. RENOVATION USING PREFABRICATED FAÇADE ELEMENTS

    University essay from Lunds universitet/Institutionen för arkitektur och byggd miljö; Lunds universitet/Avdelningen för Energi och byggnadsdesign

    Author : Aleksandra Milkova; Mohamed Soliman; [2024]
    Keywords : Keywords: Energy use; Reduce energy; EU; IVL; LKF; TES façade; Multi-active façade; Alingsås façade; Million Programme; Moisture risk analysis; Attachment; Thermal performance; WUFI; AUTOCAD; HEAT2; Technology and Engineering;

    Abstract : The building sector uses about 40% of the total global energy use. Sweden aims to reach its new goal to reduce the energy use in their residential sector as well as commercial sector by 20%, which should be reached by year 2020 and 50% by year 2050. READ MORE

  2. 2. Study of active technologies for prefabricated multi-active facade elements for energy renovation of multi-family buildings

    University essay from Lunds universitet/Avdelningen för Energi och byggnadsdesign

    Author : Ahmed Hadzimuratovic; Markus Swedmark; [2016]
    Keywords : Multi-active façade element; BIPV; LCC; heat losses from façade integrated ductwork; Technology and Engineering;

    Abstract : In Sweden, between 1964 and 1975, approximately one million dwellings were raised in the so called million programme. Due to their age and often neglected maintenance regarding both building envelope and installations, in many cases, comprehensive retrofitting is now required. READ MORE

  3. 3. Multi-active Façades for Renovation of Million Program Houses

    University essay from Lunds universitet/Avdelningen för Energi och byggnadsdesign

    Author : Linn Adolfsson; Charlotte Andersson; [2016]
    Keywords : Million program house; Multi-active façade; Traditional renovation measures; LCC analysis; Energy calculations; Technology and Engineering;

    Abstract : Sweden faces an upcoming period where thousands of buildings built during the million program period will be in need of a façade renovation. There is a large energy-saving potential in these buildings, since they are often poorly insulated and often have a ventilation system without heat recovery. READ MORE