Essays about: "assembly and pre-assembly"
Found 4 essays containing the words assembly and pre-assembly.
-
1. Investigating the barriers to increase Levels of Automation. : A case study in pre-assembly of tap changer assembly line.
University essay from Högskolan i Jönköping/JTH, ProduktionsutvecklingAbstract : The overarching goal of this thesis is to investigate and explore the barriers that a company would face while increasing the Levels of Automation (LoA), in the preassembly production unit. To achieve the primary goal of investigating the barriers this study takes a threefold approach. READ MORE
-
2. Humanoid Robots and Artificial Intelligence in Aircraft Assembly : A case study and state-of-the-art review
University essay from Högskolan i Jönköping/JTH, Industriell organisation och produktionAbstract : Increasing demands, a need for more efficient manufacturing processes and pressure to remain competitive have been driving the development and use of technology in the industry since the industrial revolution. The number of operational industrial robots worldwide have been increasing every year and is expected to reach 3 billion by 2020. READ MORE
-
3. Logistics System Design and Flow Analysis in Van Racking Industry : The case of flow reorganization at Tevo.
University essay from KTH/Industriell produktionAbstract : Det brittiska bilinredningsföretaget Tevo Limited som levererar bilinredning avsedd för servicefordon strävar efter att bli marknadsledande, och befinner sig därav i en expansionsprocess av sina tjänster. Då företaget söker efter resurssnåla förbättringar av sina processer förmedlades detta examensarbete genom deras svenska samarbetspartner Modul-System. READ MORE
-
4. Offshore Wind Turbine Transportation & Installation Analyses Planning Optimal Marine Operations for Offshore Wind Projects
University essay from Institutionen för kultur, energi och miljöAbstract : Transportation and installation of offshore wind turbines (Tower, Nacelle and Rotor) is a complete process conducted over several phases, usually in sequence. There are several factors that can turn this process into a challenge. These factors can either be due to offshore site conditions or the technical limitations of the installation vessels. READ MORE