Essays about: "construction delay"

Showing result 1 - 5 of 33 essays containing the words construction delay.

  1. 1. Permanent Fire Load of the Building Envelope

    University essay from Lunds universitet/Avdelningen för Brandteknik

    Author : Gizelle Danine Pondevida Jamero; [2023]
    Keywords : Permanent fire load; temporary fire load; fire load; building envelope; insulation; building content; upholstered furniture; heat of combustion; MCC; bomb calorimeter; cone calorimeter; room corner test.; Technology and Engineering;

    Abstract : Fire load, the total thermal energy released by the combustion of a material, is an essential part of determining a building’s fire performance and the associated fire protection strategies. Elements in a structure are typically categorized into two types of fire loads: permanent and temporary. READ MORE

  2. 2. Estetiska värden hos gröna tak

    University essay from SLU/Dept. of Landscape Architecture, Planning and Management (from 130101)

    Author : Stina Ekström; [2023]
    Keywords : gröna tak; extensiva gröna tak; takvegetation; kulturella ekosystemtjänster; urbanisering; klimat; hälsa; estetik;

    Abstract : Grönblå infrastruktur och naturbaserade lösningar i staden blir allt viktigare med de klimatförändringar som pågår. I den urbana miljön kan gröna tak bidra med viktiga ekosystemtjänster för att t ex fördröja dagvattenavrinningen från tak, dämpa buller nära bygganden, rena luft, öka biologisk mångfald samt förbättra kulturella och estetiska värden. READ MORE

  3. 3. The climate impact of fishways : A life cycle assessment of Blyberg’s and Spjutmo’s up- and downstream fishways

    University essay from Linköpings universitet/Industriell miljöteknik

    Author : Ellen Lundin; Lovisa Liljenberg; [2023]
    Keywords : LCA; life cycle analysis; life cycle assessment; fishways; fish; fish migration; climate impact; technical fishways; co2 equivalents; co2 eq; hydro power; HPP; Sweden; construction; concrete; reinforcement steel;

    Abstract : The Swedish national plan for reapproval of hydropower describes that hydropower plants (HPPs) are required to be reassessed to ensure that modern environmental conditions are set for the permits. Since dams and HPPs create barriers for migrating fish and consequently disfavor biological diversity, one consequence of the national plan is that fishways are being constructed. READ MORE

  4. 4. Random Edge is not faster than Random Facet on Linear Programs

    University essay from KTH/Matematik (Avd.)

    Author : Nicole Hedblom; [2023]
    Keywords : Simplex method; simplex; Random Edge; Linear Programming; Random Facet; randomized pivoting rule; Markov decision process; Simplexmetoden; Random Edge; linjärprogrammering; Random Facet; Markov-beslutsprocess;

    Abstract : A Linear Program is a problem where the goal is to maximize a linear function subject to a set of linear inequalities. Geometrically, this can be rephrased as finding the highest point on a polyhedron. The Simplex method is a commonly used algorithm to solve Linear Programs. READ MORE

  5. 5. Managing Novel Risks in Construction Projects : A Zimbabwean Construction Industry Case Study of Risk Management during the Covid-19 Pandemic

    University essay from KTH/Fastigheter och byggande

    Author : Linda Mupedza; [2022]
    Keywords : Covid-19; Coronavirus Pandemic; Construction Project Risks; Construction Project Risk Management; Novel Risks; Covid-19; Coronavirus Pandemi; Byggprojektriker; Riskhantering i byggprojekt; Unika Risker;

    Abstract : Risk management is quite a broad and essential part of project management in construction projects. Often, risk management focuses on perceived risks that can easily be predicted and managed. However, little attention is given to novel risks or risks that are not possible to predict and are unforeseen. READ MORE