Essays about: "fullskaleförsök"
Found 5 essays containing the word fullskaleförsök.
-
1. Analysis of an Inclined Pile in Settling Soil
University essay from KTH/Jord- och bergmekanikAbstract : The use of inclined piles is an efficient way to handle horizontal forces in constructions. However, if the soil settles the structural bearing capacity of each pile is reduced because of induced bending moments in the pile. There are several reasons for a soil to settle, e.g. READ MORE
-
2. Evaluation of a concrete plug : From the Dome Plug Experiment DOMPLU at Äspö HRL
University essay from KTH/BetongbyggnadAbstract : In SKB’s Äspö Hard Rock Laboratory (HRL) a full scale test of a concrete plug,part of a sealing structure for the depository of spent nuclear fuel, has been carriedout. The aim of this thesis is to evaluate the behavior of the concrete plug and howit corresponds to assumptions made during the design. READ MORE
-
3. Investigation on the gas-cooling effects of CAFS
University essay from Lunds universitet/Avdelningen för Brandteknik; Lunds universitet/Avdelningen för Riskhantering och SamhällssäkerhetAbstract : This report investigates the gas-cooling effects of compressed air foam (CAF). A literature review has been made on the subject and on related issues in order to gather information. Two experimental series were conducted, the first to evaluate the gas-cooling properties of CAF compared to water. READ MORE
-
4. Energy savings with a new aeration and control system in a mid-size Swedish wastewater treatment plant
University essay from Avdelningen för systemteknikAbstract : Within this study it was investigated how much energy and money that could be saved by implementing new aeration equipment and aeration control in Sternö wastewater treatment plant (WWTP). Sternö WWTP is a full-scale plant built in 1997 and dimensioned for 26 000 population equivalents. READ MORE
-
5. Control of sludge bulking in an SBR-plant treating slaughterhouse wastewater
University essay from Institutionen för geovetenskaperAbstract : Sedan december 2003 har Kalmar läns slakteris (KLS) nya reningsverk varit i drift. Entreprenör för det nya reningsverket samt driftansvariga under det två första åren är Läckeby Water Group. Verket är av SBR-typ (Sekventiell Biologisk Rening) med biologisk kväverening och kemisk fällning av fosfor med hjälp av järnklorid. READ MORE