Essays about: "interaktionsmodeller"

Found 3 essays containing the word interaktionsmodeller.

  1. 1. Applying Model Selection on Ligand-Target Binding Kinetic Analysis

    University essay from KTH/Proteinvetenskap

    Author : Klara Djurberg; [2021]
    Keywords : LigandTracer; kinetic models; Rituximab; Bayesian inference; Bayesian model selection; LigandTracer; interaktionsmodeller; Rituximab; Bayesiansk inferens; modellval;

    Abstract : The time-course of interaction formation or breaking can be studied using LigandTracer, and the data obtained from an experiment can be analyzed using a model of ligand-target binding kinetics. There are different kinetic models, and the choice of model is currently motivated by knowledge about the interaction, which is problematic when the knowledge about the interaction is unsatisfactory. READ MORE

  2. 2. Hierarchical Dynamic Games for Human-Robot Interaction with Applications to Autonomous Vehicles

    University essay from KTH/Matematik (Avd.)

    Author : Elis Stefansson; [2018]
    Keywords : ;

    Abstract : The deployment of autonomous vehicles has become an active area of research due to its potential solution as a more efficient and intelligent transportation system. While early research focused on isolated systems, autonomous vehicles integrated on public roads have lately received substantial attention. READ MORE

  3. 3. Interactive Structural Analysis for the Conceptual Design Phase

    University essay from Lunds universitet/Byggnadsmekanik; Lunds universitet/Institutionen för byggvetenskaper

    Author : Mattias Lilja; [2016]
    Keywords : conceptual structural design; direct manipulation; interactive structural analysis; structural design comparison; konceptuell strukturdesign; direkta interaktionsmodeller; interaktiv strukturanalys; jämförelse av mekaniska system; Technology and Engineering;

    Abstract : The importance of structural demands is usually overlooked in the conceptual design phase. Architects commonly conceive the geometry of a structure without much involvement of an engineer or with regards to structural demands. This is in part because a lack of tools available to engineers in this phase. READ MORE