Essays about: "prioritize projects"

Showing result 1 - 5 of 41 essays containing the words prioritize projects.

  1. 1. Headfirst into shallow water - Wetland restoration and its contribution to the Habitats Directive

    University essay from Uppsala universitet/Växtekologi och evolution; Uppsala universitet/Institutionen för biologisk grundutbildning

    Author : Elin Brandt Korall; [2024]
    Keywords : Wetlands; GIS; Restoration; Rewetting; Ecology; LONA; Habitats Directive; Natura 2000; Nature conservation; Våtmarker; GIS; Geografiska informationssystem; Restaurering; Återvätning; LONA; Art- och Habitatsdirektivet; Natura 2000; Naturvård;

    Abstract : Located in the borderland between aquatic and terrestrial environments, the wetlands cover a wide spectrum of habitats and enable living standards for a great variety of organisms. Although important habitats, a great extent of the original wetlands have disappeared in Europe and Sweden due to anthropogenic disturbances. READ MORE

  2. 2. Stakeholder Behaviour and Management During the Course of a Project : A Case Study on Green Energy Project Operation

    University essay from Uppsala universitet/Industriell teknik

    Author : Yuzhou Fang; [2023]
    Keywords : project management; stakeholder management; SM; engineering equipment procurement; stakeholder salience; stakeholder inclusion;

    Abstract : Project stakeholder management (SM) as one of the building blocks for project management theory has been studied by many scholars, and a lot of theoretical frameworks are developed to analyse relevant stakeholders based on different groups of attributes to formulate appropriate expectation managing strategies. Nevertheless, contemporary research rarely describes the dynamic change of stakeholder relationship during the course of a project and mainly focuses on public-private partnership projects where the relationships are complex and some external stakeholders can be threatening to project goals. READ MORE

  3. 3. BMA / BEURA : Evolving inhabitation through self-building and adaptive reuse

    University essay from KTH/Urbana och regionala studier

    Author : Karl Hedin; [2023]
    Keywords : Self-building; adaptive reuse; circular construction; Bromma airport; dynamic plotting; Självbyggeri; återbruk; cirkulär konstruktion; Bromma flygplats; dynamisk plottning;

    Abstract : My thesis, "BMA (Bromma airport) / BEURA (Bromma experimental urban recycling association), an adaptive rebirth", explores the potential for an evolution of self-built circular inhabitation on the airport runway of Bromma through adaptive reuse and circular construction. The Bromma Airport in Stockholm is set to cease operation by 2038, leaving behind a vast expanse of infrastructure that could be repurposed for other uses. READ MORE

  4. 4. Develop a Process for the Selection of New Continuous Improvement Projects : A case study of the prioritization of Lean Six-Sigmain the quality management team in an assembly industry through the AHP method

    University essay from Mälardalens universitet/Akademin för innovation, design och teknik

    Author : Roopa Attibele Prakash; Adeleh Edalati; [2023]
    Keywords : CI Projects; MCDM methods; AHP; FMEA; Project Prioritization;

    Abstract : The research focuses on the selection and prioritization of Continuous Improvement (CI)projects in organizations. This study emphasizes the importance of recognizing appropriatecriteria for selecting projects that align with an organization's needs, skills, and goals. READ MORE

  5. 5. The Competitive Dynamic Among Projects in Multi-Project Environment : Project Managers' Perception

    University essay from Karlstads universitet/Handelshögskolan (from 2013)

    Author : Susanna Bjunö; [2023]
    Keywords : Competition; multi-project environment; Emotional Intelligence EI ; social interdependency theory; Governance.; Konkurrens; Multiprojektmiljö; Emotionell intelligens EI ; Teori om socialt ömsesidigt beroende social interdependency theory ; Projekt styrning.;

    Abstract : The study explores the project manager’s perception of the competitive dynamic amongst the projects that utilize the same organizational resources in the multi-project context.   The method used is a qualitative research design with an inductive approach where the data corpus was analyzed through thematic analysis. READ MORE