Essays about: "resource management in specific company"

Showing result 1 - 5 of 61 essays containing the words resource management in specific company.

  1. 1. Powering Tomorrow - Implementation of Battery Energy Storage System in today's Power Grid

    University essay from Lunds universitet/Produktionsekonomi

    Author : Henrik Ramström; Krenar Gerxhaliu; [2024]
    Keywords : Battery energy storage system; Technology strategy; Resource based view; Technology acquisition; Technology life cycle; Virtual power plant; Value proposition; Ancillary services; Energy market; Innovation; Product development; Technology and Engineering;

    Abstract : Title Powering Tomorrow - Implementation of Battery Energy Storage System in today's Power Grid Authors Henrik Ramström and Krenar Gerxhaliu Supervisor Ingela Elofsson, Dept. of Production Management, Faculty of Engineering, Lund University Maricruz Bravo, Flower Infrastructure Technologies AB Background We are currently undergoing a transition in the industrial development, taking place globally. READ MORE

  2. 2. Robotic Automation of Mechanical Verification

    University essay from KTH/Integrerad produktutveckling och design

    Author : Sofie Gårdestam; Amalia Kronér; [2024]
    Keywords : ;

    Abstract : This master thesis explores the implementation of Collaborative robots into Elekta's mechanical product verification process. Elekta is a pioneer in precision radiation therapy solutions. Ensuring the compliance of Elekta's products with performance, safety, and quality criteria is of great importance. READ MORE

  3. 3. The road to an accurate cost estimation in engineer-to-order manufacturing - A case study of cost estimation accuracy within advanced technology development in a defence and security company

    University essay from Göteborgs universitet/Graduate School

    Author : Lawin Anwar; Sandra Barría Colliander; [2023-07-03]
    Keywords : Engineer-to-order; new product development; cost management; cost engineering; cost estimation error; cost overruns; cost estimation accuracy; project management;

    Abstract : Estimating the costs of a project is a vital part of manufacturing organisations as estimations are what set the basis for the price of the products. Precise estimates allow for effective planning and resource allocation, ensuring that the necessary materials, equipment, and personnel are available to complete the project on time and within budget. READ MORE

  4. 4. A study investigating the factors that causes delays in construction equipment projects in UX/HMI area

    University essay from KTH/Väg- och spårfordon samt konceptuell fordonsdesign

    Author : Shivalika Shivalika; [2023]
    Keywords : Construction equipment projects; delays; User Experience UX ; Human-Machine Interface HMI ; Volvo Construction Equipment; qualitative analysis; quantitative analysis; project management; communication; collaboration; Produktutvecklingsprojekt; arbetsmaskiner; förseningar; användarupplevelse UX ; människa-maskin-gränssnitt HMI ; Volvo Construction Equipment; kvalitativ analys; kvantitativ analys; projektledning; kommunikation; samarbete;

    Abstract : This research study investigates the factors contributing to delays in construction equipment projects, specifically in the User Experience (UX) and Human-Machine Interface (HMI) area, with a particular focus on projects conducted at the company Volvo Construction Equipment. The study incorporates a literature review, a mixed-methods approach combining qualitative and quantitative analysis, and in-depth discussions. READ MORE

  5. 5. Involving Public Transport Companies in Disaster Management During a Blackout – A Feasibility Study

    University essay from Lunds universitet/Avdelningen för Riskhantering och Samhällssäkerhet

    Author : Sophie-Louise Pries; [2023]
    Keywords : blackout; disaster management authority; public transport company; cooperation concept; feasibility study; buses; disaster management structures in Germany; Technology and Engineering;

    Abstract : This thesis explores how a blackout can be better managed using existing public transport company resources. The study addresses three research questions by assessing the feasibility of possible cooperation between local public transport companies and disaster management authorities during a blackout. READ MORE