Essays about: "supplier system project"
Showing result 1 - 5 of 49 essays containing the words supplier system project.
-
1. Mitigation of supply chain uncertainties caused by material shortage : A case study with Loccioni
University essay from Uppsala universitet/Institutionen för samhällsbyggnad och industriell teknikAbstract : The ongoing semiconductor shortage impacts organizations throughout the supply chain operationally and financially. Limited material for a sudden increase in demand during the Covid-19 pandemic led to a heightened supplier power and result in the prioritization of customers. READ MORE
-
2. Status Mapping of tank to grave management of Low-GWP refrigerants.
University essay from KTH/Skolan för industriell teknik och management (ITM)Abstract : Refrigeration plays a vital role today in various residential, commercial, and industrial processes, requiring refrigerants to facilitate the cooling or heating processes. Over time, refrigerants have undergone significant changes to meet technological, social, environmental, and economic needs. READ MORE
-
3. A top-down investigation of the possible extension of oxygen concentrator use within Swedish healthcare, with regards to national and global benefits
University essay from Lunds universitet/Avdelningen för Biomedicinsk teknikAbstract : Oxygen concentrators are relatively small medical devices that concentrates oxygen from the ambient air next to the patient. They are widely used in low resource settings and in the home health care. READ MORE
-
4. Causes of and solutions to reduce excess material in production processes : A study of electrical motors and generators at ABB Machines
University essay from Linköpings universitet/Industriell miljöteknikAbstract : This thesis focus on the investigation of material usage in the production processes of electrical motors and generators at ABB Machines, a company based in Västerås, Sweden. The study aims to understand the reasons for the occurrence of excess material after the assembly of a motor or generator and explore possible solutions to minimize its occurrence. READ MORE
-
5. Integration of Advanced Product Quality Planning in Quality Preparation for an Original Equipment Manufacturer in the Automotive Industry : A Case Study at Volvo Group Trucks Operations Powertrain Production in Skövde
University essay from Luleå tekniska universitet/Institutionen för ekonomi, teknik, konst och samhälleAbstract : This study examines the development of Volvo Group Trucks Operations Powertrain Production (Volvo GTO PTP) in Skövde, focusing on the implementation of processes for new products intended for both internal and external customers. Previously, the company solely supplied products within the Volvo Group, functioning as an Original Equipment Manufacturer (OEM). READ MORE