Essays about: "tunnel mapping"
Showing result 1 - 5 of 15 essays containing the words tunnel mapping.
-
1. Which functional and design aspects to prioritize when developing outdoor tents - To optimize customer satisfaction and four season use.
University essay from Högskolan i Borås/Akademin för textil, teknik och ekonomiAbstract : Optimizing customer satisfaction is vital to maintain relevance as well as being competitive on a growing market. This research is aimed to explore what aspects of design and functionality that should be prioritized when developing solo tunnel tents for four season use within a European market. READ MORE
-
2. U - Net Based Crack Detection in Road and Railroad Tunnels Using Data Acquired by Mobile Device
University essay from KTH/GeoinformatikAbstract : Infrastructures like bridges and tunnels are significant for the economy and growth of countries, however, the risk of failure increases as they getting aged. Therefore, a systematic monitoring scheme is necessary to check the integrity regularly. READ MORE
-
3. Towards a sustainable and just energy system in the city of Malmö : Social Innovations in the Energy Sector
University essay from Malmö universitet/Institutionen för Urbana Studier (US)Abstract : Like many other European cities, Malmö has set ambitious goals to become Sweden’s first carbon-neutral city by 2030. This objective is aligned with several public entities such as the Öresund Region, the Swedish Energy Agency, the European Union, and the UN within the Agenda 2030 for Sustainable Urban Development. READ MORE
-
4. Tunnel Seismic Prediction in Stockholm Bypass
University essay from KTH/Jord- och bergmekanikAbstract : Tunnel Seismic Prediction (TSP) is a geophysical investigation method used to predict the rock conditions ahead of the tunnel face. The method has been used in different types of rock and rock conditions. READ MORE
-
5. Systematic errors in the characterization of rock mass quality for tunnels : a comparative analysis between core and tunnel mapping
University essay from KTH/Jord- och bergmekanikAbstract : This thesis analyzes the potential systematic errorin the characterization of the rock mass quality in borehole and tunnel mapping. The difference when assessing the rock mass quality refers to the fact that the characterization performed on drilled rock cores are commonly done on-meter length, while the tunnel section can be up to 20-25 m wide. READ MORE