CROSS-BORDER WIND POWER PLANNING: A CASE STUDY OF THE SOUTHERN KURIL ISLANDS

University essay from Uppsala universitet/Institutionen för geovetenskaper

Abstract: Combating climate change has become the key objective of the 21st century. Energy transition, with the intensive introduction of the renewable energy sources to the world’s energy systems, is one of the biggest driving forces in stimulating global sustainable development. Growing shares of renewables, including wind power as a major player (35% of the world’s electricity needs by 2050 raised the issues of grid stability and supply/demand balancing (IRENA, 2019). A popular view on solutions for these issues lies with global energy interconnections, which could support grid stability and let the countries trade green electricity between themselves, creating big regional or even global electricity markets. These interconnections would call for close cooperation between the states, not only in the sphere of transmission, but in generation as well. The cross-border character of such projects would bring new aspects and nuances to the wind power developer’s work, making it more complex and politically sensitive. The potential planning process of such wind power projects has not been investigated before. Therefore, in order to fill this research gap, a cross-border wind power environment analysis framework was developed on the basis of the reviewed literature to assist a wind power developer in a potential planning process of a complex cross-border wind energy project in a sensitive setting. The developed framework was then used to evaluate an empirical case of an assumed offshore wind park on the Southern Kuril Islands, a disputed territory between Japan and Russia. The results showed that introduction of the cross-border factor makes permitting and coordination of projects more challenging and confusing. In addition to that, the wind power developer might have to contribute to the development of improved wind power regulations and norms. Moreover, coordination of such projects would not involve only the developer, but most likely representatives of the involved countries and regions, and possibly mediating organisations; the developers’ work would take place in a multicultural environment with people of various traditions, values, economic backgrounds and interests, which would complicate balancing the stakeholders’ interests during the planning phase.

  AT THIS PAGE YOU CAN DOWNLOAD THE WHOLE ESSAY. (follow the link to the next page)