Design and Implementation of Shop Floor Management Information System at BOSCH Rexroth AB

University essay from KTH/Industriell produktion

Abstract: This master thesis is conducted as a conclusion of Master of Science degree in Production Engineering and Management at KTH Royal Institute of Technology. The focus of this thesis work is to make the work more convenient and improve production efficiency by building a management information system (MIS) thus replacing manual and decentralized information management mode on the shop floor. With the use of the computers in the office and tablets beside the machine of each work center on the shop floor, personnel can have access to the necessary information easily and quickly.   This management information system is built according to the actual production situation and needs in Bosch Rexroth AB in Mellansel. First, research on the production process and the management mode in the factory is conducted. Then, the form and the architecture of the system are decided. After thorough understanding and comparison, web application form and currently widely used Browser/Server (B/S) architecture are adopted. Finally, during the detailed design and system implementation process, databases and functional modules are developed. Microsoft Access is chosen as the database implementation. Microsoft Visual Studio.NET combined with C# language and IIS (Internet Information Service) is chosen as the application development tool. When conducting the user trial test on the shop floor, functions of this application system well meet the requirements, and associates can easily and quickly access the information. This application system can speed up the information flow in production, realizing more scientific, standardized and efficient management, which ultimately promotes the production and management of the enterprise.   This management information system realizes the following functions in a digitized way: 1. system security management: user registration, log in and permission settings; 2. drawings viewing; 3. instructions viewing; 4. maintenance recording and checking; 5. deviation reporting and processing; 6. process confirmation recording and checking.

  AT THIS PAGE YOU CAN DOWNLOAD THE WHOLE ESSAY. (follow the link to the next page)