Advanced search
Showing result 16 - 20 of 108 essays matching the above criteria.
-
16. Load profiling and customer segmentation for demand-side management
University essay from KTH/Skolan för elektroteknik och datavetenskap (EECS)Abstract : The energy transition is accompanied by massive electrification of uses and sectors such as transport. As a result, the pressure on the electricity grid is increasing, and the time to connect to the power system is lengthening. READ MORE
-
17. Investigation of the Plasma delay time in PIPS detectors using the LOHENGRIN spectrometer
University essay from Uppsala universitet/Tillämpad kärnfysikAbstract : This project has examined the effects of plasma delay time (PDT) and pulse height defect (PHD) for protons, tritons and alpha particles. The goal was to determine PDT and PHD for alpha particles relative to protons, by using data from a subset of measurements taken with a silicon detector of type PIPS at the LOHENGRIN spectrometer. READ MORE
-
18. Energy storage for peak shaving : Case study for the distribution grid in Björnarbo
University essay from Uppsala universitet/Institutionen för samhällsbyggnad och industriell teknikAbstract : Sala-Heby Energi Elnät is a supplier of electrical power for the communities of Sala, Heby, Morgongåva and Björnarbo in Uppland, Sweden. The electrical power grid in this area is currently facing several challenges. Bottlenecks and power shortages are some of them. READ MORE
-
19. A New Market Logic Approach for Achieving Load Profile Smoothness in the Swedish Electricity Market : Incorporating Inventory Management Principles for Optimized Battery Operation
University essay from Mälardalens universitet/Akademin för ekonomi, samhälle och teknikAbstract : As the demand for imported electricity from the grid continues to increase in Södermanland county, achieving a smoother load profile for the overall imports becomes very critical. The utilization of batteries in every type of a company’s infrastructure aims to provide a backup solution when the electric network’s capabilities are unable to support demand for high imported capacities. READ MORE
-
20. Power systems with local PV-generation and battery storage for peak shaving to provide flexibility services to the utility grid
University essay from Uppsala universitet/ElektricitetsläraAbstract : Due to the increased demand for electricity in recent years and the estimated demand in the future it has become clear that the capacity of the Swedish electrical grid is insufficient, and the grid is not able deliver the amount of power that is demanded by the market. The crucial points in the grid where the grid capacity is insufficient could be several. READ MORE