Essays about: "Manufacturability Analysis System"

Showing result 1 - 5 of 8 essays containing the words Manufacturability Analysis System.

  1. 1. Concept Design Improvement of Shift Fork for New Dog Clutch Actuator : Simulation driven product development approach

    University essay from Jönköping University/JTH, Industriell produktutveckling, produktion och design

    Author : Nirmal Srinivasan; [2021]
    Keywords : Product development; Dynamic analysis; Equivalent-static load; Finite Element Method; Fatigue analysis; High-Pressure Die Casting; Computer-Aided Engineering; Computer-Aided Design; Topology optimization.;

    Abstract : Kongsberg Automotive is developing a brand-new actuator for engaging and disengaging a clutch for different driveline applications. This master thesis research improves the concept design of the shift fork for the new Dog-Clutch Actuator using Design for Manufacturability (DFM). READ MORE

  2. 2. Elbow Design, Servo Motor Selection and Control Implementation of the Agile Parallel Kinematic Manipulator

    University essay from Lunds universitet/Industriell Produktion

    Author : Hampus Farmängen; Felix Lundblad; [2019]
    Keywords : Technology and Engineering;

    Abstract : The purpose of this work was to contribute to the creation of a prototype of a new type of robot called Agile Parallel Kinematic Manipulator or AgilePKM for short. Designing, building and controlling a new type of robot is a task which goes beyond the scope of any master thesis project, but there are subtasks which are more suitable to handle within the available time frame. READ MORE

  3. 3. Design and development of a lathe spindle

    University essay from KTH/Maskinkonstruktion (Inst.)

    Author : Asim Kutlu; [2016]
    Keywords : ;

    Abstract : Verktygsmaskiner möjliggör tillverkning av materiekroppar med olika form. Svarvar är de vanligaste maskinerna för att bearbeta runda detaljer. Man kan säga att en svarvspindeln möjliggör hela skärprocessen och att den därför är den viktigaste komponenten i en svarv. READ MORE

  4. 4. Understanding the Problems in Volume Production and their Connections to Management of New Product Introduction Projects : A Case Study of the Project Management Factors and the Appurtenant Production Effects from Ramp-Up of New Product in Production for Contract Electronics Manufacturing

    University essay from Linköpings universitet/Industriell ekonomi

    Author : Niclas Frost; [2016]
    Keywords : Ramp-Up; New Product Introduction; Contract Manufacturing; New Product Development; New Product Development Projects; Production Ramp-Up; Industrialization; Time-To-Volume; Contract Electronics Manufacturing; Volume Production; Series Production; Low-Volume Production; Production Disturbances;

    Abstract : The ongoing globalization of companies has resulted in a highly competitive business climate where companies have to be cost-effective but still flexible with fast response to customer feedback and present in the international scene. In order to meet the fast paced technological development from the competition and changing demand of the customers, companies focus on creating new products and reducing their time-to-market with an early product launch to gain profits from increased market shares. READ MORE

  5. 5. Producibility Assessment System : Enhancing modularization, robustness and flexibility

    University essay from Högskolan i Jönköping/JTH, Produktutveckling

    Author : Max Jacobson; [2016]
    Keywords : Aerospace; Manufacturability Analysis System; Knowledge-Based Engineering; Software Engineering; System Engineering; Robustness; Flexibility; Concurrent Engineering; Set-Based Engineering;

    Abstract : Developing high-end aerospace components is a complex and highly competitive business. Hence methods for decreasing lead-time, while still providing the same quality and at a lower cost, has to be developed. This thesis is conducted at Research & Technology - GKN Aerospace in Trollhättan Sweden. READ MORE