Advanced search

Found 5 essays matching the above criteria.

  1. 1. The Implementation of Total Productive Maintenance (TPM) InManufacturing Company : A Case Study of XYZ Plastics Manufacturing Company in Nigerian

    University essay from Högskolan i Borås/Akademin för textil, teknik och ekonomi

    Author : Femi Gbenga Labiyi; [2019]
    Keywords : 5S; 8Pillars and lean TPM: Total Productive Maintenance PM: Productive Maintenance JIT: Just-In-Time TQM: Total Quality Management OEE: Overall Equipment Effectiveness MTTR: Mean time to repair MTBF: Mean time between failures;

    Abstract : The purpose of this thesis is to implement Total Productive Maintenance (TPM) in Nigeria Plastics Manufacturing Company. Manufacturing companies round the world pay huge amount of money for purchasing new equipments to boost their production however nothing or little is done to achieve or obtain full output from the machine for which it is intended to do. READ MORE

  2. 2. Effect analysis of Reliability, Availability, Maintainability and Safety (RAMS ) Parameters in design and operation of Dynamic Positioning (DP) systems in floating offshore structures

    University essay from KTH/Industriell produktion

    Author : Ali Ebrahimi; [2010]
    Keywords : Dynamic Positioning system DP ; Maintenance; Condition based;

    Abstract : The objective of this thesis is to identify, which hazards and failures in operation process will affect Reliability, Availability, Maintainability and Safety of floating offshore structures. The focus is on Dynamic Positioning (DP) system that has the responsibility of keeping the offshore structure in the upright position operation. READ MORE

  3. 3. Effect analysis of Reliability, Availability, Maintainability and Safety (RAMS ) Parameters in design and operation of Dynamic Positioning (DP) systems in floating offshore structures

    University essay from KTH/Industriell produktion

    Author : Ali Ebrahimi; [2010]
    Keywords : ;

    Abstract : The objective of this thesis is to identify, which hazards and failures in operation process will affect Reliability, Availability, Maintainability and Safety of floating offshore structures. The focus is on Dynamic Positioning (DP) system that has the responsibility of keeping the offshore structure in the upright position operation. READ MORE

  4. 4. A Simulation Program for Forecasts of Production at Tetra Pak Packaging Material AB in Lund

    University essay from Lunds universitet/Förpackningslogistik

    Author : Dan Lennartsson; Peter Månsson; [2004]
    Keywords : Simulation; Forecasts of production; Tetra Pak Packaging Material AB; Technological sciences; Teknik; Technology and Engineering;

    Abstract : Tetra Pak Packaging Material AB (TPPM) is the division within the Tetra Pak concern that produces the packaging material that later on will be used for liquid products. There are 63 TPPM plants in the world, and the factory in Lund is one of the largest with its 325 employees. READ MORE

  5. 5. Simulation project at Tetra Pak

    University essay from Lunds universitet/Förpackningslogistik

    Author : Hector Llop Pla; [1999]
    Keywords : Simulation; Distribution; Tetra Pak; Technological sciences; Teknik; Technology and Engineering;

    Abstract : This work has been done for Tetra Pak Distribution (TPD) at the Department of Engineering Logistic at the Lund Institute of Technology. My task was mainly to create a set of simulation models based on the Tetra Pak Distribution Lines. READ MORE