Essays about: "production system volvo"
Showing result 1 - 5 of 61 essays containing the words production system volvo.
-
1. End User Study of an Engineering Design Tool
University essay from Göteborgs universitet/Institutionen för data- och informationsteknikAbstract : [Context and Motivation] PROSIT+ Designer is a Volvo Group-developed application focused on operational development for vehicle production. Since its launch, 15 years ago, PROSIT+ Designer has not had any major revisions or updates. [Question/problem] The frustrations from end users are, as a result, piling up. READ MORE
-
2. Streamlining the flow of material through buffer simulation and multi-objective optimization, with regards to sustainability : A case study at Volvo Construction Equipment
University essay from Linnéuniversitetet/Institutionen för maskinteknik (MT)Abstract : This thesis will provide knowledge on how to maintain a well developed flow of material while at the same time finding an optimal level of capacities for buffers. Simultaneously, aspects that allow for positive sustainability practices will be regarded. Buffers have a considerable impact on the performance of a production system. READ MORE
-
3. Integration of Advanced Product Quality Planning in Quality Preparation for an Original Equipment Manufacturer in the Automotive Industry : A Case Study at Volvo Group Trucks Operations Powertrain Production in Skövde
University essay from Luleå tekniska universitet/Institutionen för ekonomi, teknik, konst och samhälleAbstract : This study examines the development of Volvo Group Trucks Operations Powertrain Production (Volvo GTO PTP) in Skövde, focusing on the implementation of processes for new products intended for both internal and external customers. Previously, the company solely supplied products within the Volvo Group, functioning as an Original Equipment Manufacturer (OEM). READ MORE
-
4. Assessment of Machine tool flexibility in a Production system
University essay from KTH/ProduktionsutvecklingAbstract : This project aims to present machine tool characteristics which may induce limiting factors in terms of flexibility. The aim is also to present a current state description of the machine tools in the production system regarding their characteristics in terms of quantifiable results. READ MORE
-
5. Production improvement using Discrete Event Simulation : case study of Volvo Penta engine production line
University essay from Högskolan i Skövde/Institutionen för ingenjörsvetenskapAbstract : The global market forces manufacturers to minimise costs, meet production schedules, and improve productivity to stay competitive. The produced products require higher customisations, which are affecting the complexity of the production system. Companies seeking methods and tools to improve their production system. READ MORE