  1. 1. Telescopic Tower Facilitating Installation of ≥12 MW Offshore Wind Turbines

    University essay from Uppsala universitet/Institutionen för geovetenskaper

    Author : Martin Pettersson; [2020]
    Keywords : Installation of Offshore Wind Turbines; Telescopic Tower; Pin and Hole Jacking System; Friction Connection; Installation av vindkraftverk till havs; teleskopisk torn; hydraulisk jacksystem; friktionskoppling;

    Abstract : The trend of offshore wind power is bigger and bigger wind turbines. Turbines are now becoming so big that existing installation vessels no longer are feasible and new bigger installation vessels are needed. READ MORE

  2. 2. Future offshore wind farm construction and maintenance strategies

    University essay from Lunds universitet/Industriell elektroteknik och automation

    Author : Jesper Strid; [2017]
    Keywords : Technology and Engineering;

    Abstract : With the wind farms moving further from shore, new challenges arise. Technicians must visit the turbines almost daily because of the constant need for maintenance. But when the transport time from shore to the wind farm turns into hours is some kind of permanent accommodation required at the farm for the technicians to live on. READ MORE

  3. 3. Dynamic positioning of a semi-submersible, multi-turbine wind power platform

    University essay from Uppsala universitet/Avdelningen för systemteknik

    Author : John Ayotte; [2015]
    Keywords : ;

    Abstract : As a growing market for offshore wind power has created a niche for deep-water installations, offshore floating wind solutions have become more and more viable as a renewable energy source. This technology is currently in development and as with many new technologies, many traditional design methods are found lacking. READ MORE

  4. 4. Offshore Wind Turbine Transportation & Installation Analyses Planning Optimal Marine Operations for Offshore Wind Projects

    University essay from Institutionen för kultur, energi och miljö

    Author : Emre Uraz; [2011]
    Keywords : Offshore wind farms; transportation and installations; jack-up vessels; wind turbine installation vessels; design trends in installation vessels; assembly and pre-assembly; project durations; onboard cranes; challenges due to offshore environment; time performance; crane operations;

    Abstract : Transportation and installation of offshore wind turbines (Tower, Nacelle and Rotor) is a complete process conducted over several phases, usually in sequence. There are several factors that can turn this process into a challenge. These factors can either be due to offshore site conditions or the technical limitations of the installation vessels. READ MORE