Essays about: "ahp case study"

Showing result 1 - 5 of 49 essays containing the words ahp case study.

  1. 1. Multicriteria Evaluation in Real Estate Land-use Suitability Analysis: The case of Volos, Greece

    University essay from Lunds universitet/Institutionen för naturgeografi och ekosystemvetenskap

    Author : Panagiotis Dimitrios Tsachageas; [2024]
    Keywords : Geography; GIS; Real Estate; Multicriteria Evaluation; Fuzzy; AHP; Earth and Environmental Sciences;

    Abstract : The integration of Geographic Information Systems (GIS) into real estate analysis has long been considered an interesting interdisciplinary pursuit, but has yet to become mainstream. Despite the increasing academic focus over the last twenty years, this endeavour has mostly been approached from the scientific side of Geography. READ MORE

  2. 2. Integrating Local Knowledge into the Spatial Analysis of Wind Power: The case study of Northern Tzoumerka, Greece

    University essay from Lunds universitet/Institutionen för naturgeografi och ekosystemvetenskap

    Author : Athanasios Senteles; [2024]
    Keywords : Geography; Geographical Information Systems; MCDA; wind energy; local knowledge; Greece; Earth and Environmental Sciences;

    Abstract : Increasing demand for incorporating renewable energy projects into the national energy mix, is associated with international and European efforts to tackle the negative effects of climate change and strengthen energy resilience. Greece, as a member country of the European Union, has acknowledged that necessity, by implementing a national program aiming to significantly reduce Green House Gas Emissions and upscale Renewable Energy Sources (RES) project development in upcoming years. READ MORE

  3. 3. ASSESSMENT OF WIND POWER PROJECTS: THE DEVELOPMENT OF A METHODOLOGY FOR EARLY-STAGE EVALUATION

    University essay from Uppsala universitet/Institutionen för geovetenskaper

    Author : Ilya Ibraheem; [2023]
    Keywords : Wind Power; Wind power project management; MCDM; AHP;

    Abstract : There is limited land accessible for the construction of wind farms due to the obstacles posed by geographical constraints, popular opposition, wildlife conservation, and power system integration. These variables make the planning of wind power projects a complex procedure requiring the consideration of numerous criteria and limits. READ MORE

  4. 4. Develop a Process for the Selection of New Continuous Improvement Projects : A case study of the prioritization of Lean Six-Sigmain the quality management team in an assembly industry through the AHP method

    University essay from Mälardalens universitet/Akademin för innovation, design och teknik

    Author : Roopa Attibele Prakash; Adeleh Edalati; [2023]
    Keywords : CI Projects; MCDM methods; AHP; FMEA; Project Prioritization;

    Abstract : The research focuses on the selection and prioritization of Continuous Improvement (CI)projects in organizations. This study emphasizes the importance of recognizing appropriatecriteria for selecting projects that align with an organization's needs, skills, and goals. READ MORE

  5. 5. Evaluation and Selection of Routes for Automated Road Freight Vehicles : Using the analytical hierarchy process (AHP) to evaluate andselect potential routes for automated driving systems (ADS) in the road freight industry when considering the operational design domain (ODD) and strategic criteria

    University essay from KTH/Produktionsutveckling

    Author : Jan Kauper; [2023]
    Keywords : ;

    Abstract : Researchers anticipate the road freight industry to be among the first ones to integrate automated driving systems (ADS) in their operations. Matching the driving capabilities with suitable routes is pivotal for deploying ADS at early stages. READ MORE