Essays about: "Line balancing"
Showing result 16 - 20 of 67 essays containing the words Line balancing.
-
16. Implementation of Lean Tools in the Garments Industry to Improve Productivity
University essay from Högskolan i HalmstadAbstract : A few years back, almost every garment manufacturer industry started implementing “lean Manufacturing.” Garments manufacturing is one of the oldest manufacturing systems, compromising a higher number of critical operations. READ MORE
-
17. Simulation-based multiobjective optimization and availability analysis of reconfigurable manufacturing systems
University essay from Högskolan i Skövde/Institutionen för ingenjörsvetenskapAbstract : Due to the changes and improvements that have occurred over the years, the manufacturing sector has evolved. Companies in the 21st-century face changes in the marketplace that are difficult to predict due to international competition and the rapid emergence of new products. READ MORE
-
18. Assembly flow design and process data digitalization for Process Industries : Flow and Line balancing with Simulation for Paper and Pulp Instruments with digital Information management
University essay from KTH/Industriell produktionAbstract : The ABB Lorentzen and Wettre in Kista produces Paper and Pulp Testing Instruments for Paper Mills worldwide. The unit has product range of over 140 instruments. In the production there is significantly longer throughput times compared to the demand takt in the assembly of instruments since they are working in a Fixed position layout. READ MORE
-
19. Investigation of ECG electrodes for burn wounds
University essay from Uppsala universitet/Institutionen för elektroteknikAbstract : This project aims to investigate a variety of electrodes for ECG (electrocardiogram) measurements and find suitable ones for burn wounded skin in association with the Burn center in Uppsala University Hospital. To this purpose, the electrical properties (in particular, electrical impedance and equivalent circuit) of electrodes and the influence of the skin on the electrical properties are looked into, and various common artefacts in ECG measurements are investigated, such as wandering baseline (caused by perspiration, respiration, patient movement and poor electrode contact), muscle tremor artefact, 50-60 Hz power line interference and measurement noise. READ MORE
-
20. Development of an Assembly Setup and Investigation of Material Feeding Concepts for the Production of Construction Equipment Cabs
University essay from KTH/Industriell produktionAbstract : Volvo CE at Hallsberg, Sweden is specialized in the production of cabs for construction equipment. The organization employs the one-line (mixed-model assembly) method, where cabs for different products are all assembled on the same main line. Operations on the main line are not standardized for all products. READ MORE