Essays about: "sub-assemblies"

Showing result 1 - 5 of 6 essays containing the word sub-assemblies.

  1. 1. Design, assembly and commissioning of a flexible testbench for propulsion system components

    University essay from KTH/Skolan för elektroteknik och datavetenskap (EECS)

    Author : Gabriele Guerra; [2020]
    Keywords : ;

    Abstract : Since its foundation in 2011 and among other things, OHB Sweden has beenappointed to fully develop, from the design to the assembly, a yearly increasingnumber of propulsion systems, ranging from chemical propelled to fully electricalspacecraft. One of the major contributor to the cost of this process, both in termsof money and time spent, is the verication phase, a combination of processes thatsets out to demonstrate that all the applicable requirements are met and to provethat the system is capable of fullling its objective during the mission lifespan. READ MORE

  2. 2. Design Study of a Wing Rudder : Exploring the Possibility to Implement Additive Manufacturing

    University essay from Luleå tekniska universitet/Institutionen för ekonomi, teknik och samhälle

    Author : Marcus Ekman; [2017]
    Keywords : Additive manufacturing; Design for additive manufacturing; Aerospace industry; Design study; Engineers process aspects;

    Abstract : Subtractive manufacturing are the most common methods in the aerospace industry to manufacture components. In these parts the buy to fly ratio is low and it needs accurate strengths analyses to static and dynamic loads especially were the different parts relate to each other with fasteners in the assembly work. READ MORE

  3. 3. Compact design of fish processing equipment and implementation of lean tools

    University essay from KTH/Industriell produktion

    Author : Sergei Sharapov; [2013]
    Keywords : ;

    Abstract : Following master thesis “Compact design of fish processing equipment and implementation of lean tools” contains description and technical information about newly developed fish processing equipment which includes 122 sub-assemblies and 626 parts. Completely new technical documentation was created and used to manufacture real and functional prototype. READ MORE

  4. 4. Implementation of UAV design into CAD

    University essay from Akademin för innovation, design och teknik

    Author : David Boman; [2011]
    Keywords : ;

    Abstract : SAMMANFATTNING Detta arbete har gått ut på att i CAD implementera en UAV-design av Enebog, Designen har förmedlats av handledaren via möten och mail. Ett ”levande” dokument skapades och har sedan uppdaterats från båda sidor genom projektets fortlöpande. Dimensioner och mått har diskuterats samt hur det ska implementeras i CAD. READ MORE

  5. 5. Production development with the future in sighta green field study at Sandvik SRP

    University essay from Lunds universitet/Produktionsekonomi

    Author : Mimmi Hansson; Sofia Svensson; [2011]
    Keywords : APS Advanced Planning System APP Advanced Production Planner BOM; Bill of Material A hierarchical list of all included parts; raw material; sub-assemblies; components etc. that are needed; and in which quantity; to produce the end product. The top level of the structure represents the finished product. BOM explosion Break apart each assembly into its components. FIFO First in-first out; an asset method and inventory term that assumes that items purchased first will be sold first. ERP Enterprise Resource Planning GREEN FIELD Project name for the investment and new facility M3 The ERP-system that is used within Sandvik Mining and Construction in Svedala. MRP Material Requirement Planning MRP II Manufacturing Resource Planning NAUTILUS The production development concept of Sandvik QLIKVIEW A business intelligence system; a tool for analysing ERP data SMC Sandvik Mining and Construction; Technology and Engineering;

    Abstract : Background: Sandvik is in the middle of a great investment, the so called Green Field investment, which will imply a new factory for parts of their stone crush production. The facility is, at current situation, in engineering phase and the preparations are in focus and running at high speed. READ MORE