Essays about: "construction lead times"

Showing result 1 - 5 of 14 essays containing the words construction lead times.

  1. 1. Reactor Chemistry in LWR SMRs : Determination of the rate constant for the reaction between boric acid and hydroxyl radicals

    University essay from KTH/Tillämpad fysikalisk kemi

    Author : Fredrik Petersson; [2023]
    Keywords : LWR; SMR; Water chemistry; Radiolysis; Boric acid; LWR; SMR; vattenkemi; Radiolys; Borsyra; Hydroxylradikal;

    Abstract : Ett problem vid byggandet av nya kärnkraftverk för elproduktion är de stora investeringskostnaderna samt den långa tiden det att få tillstånd för en reaktor och bygga den. Nyligen färdigställdes den tredje reaktorn vid Olkiluoto I Finland, den tog 18 år att färdigställa exklusive tiden att få tillstånd för reaktorn. READ MORE

  2. 2. Barns och ungas perspektiv och delaktighet inom parkförvaltning : en fallstudie av svenska kommunala parkförvaltningsenheter

    University essay from SLU/Dept. of People and Society

    Author : Nina Evelina Törn; [2021]
    Keywords : barn; ungdomar; deltagande; barns perspektiv; barnperspektiv; parkförvaltning; grönområdesförvaltning; kommunal verksamhet; children; youth; participation; children s perspectives; child-centered perspective; park management; green space management; municipal activities;

    Abstract : Kommuner har ett viktigt uppdrag i att inkludera barns och ungas perspektiv och delaktighet i samhällsutvecklingen. I och med att Barnkonventionen blev svensk lag i januari 2020 har barns och ungas rätt att höras och vara delaktiga vid beslut som rör dem stärkts. READ MORE

  3. 3. Analysis of Market-Based Flexibility Services- An Evaluation of Flexible Resources’ Indirect Impact on Network Congestion.

    University essay from Lunds universitet/Miljö- och energisystem

    Author : Tobias Gunneberg; [2021]
    Keywords : Local flexibility markets; Demand-side flexibility; Congestion management; Load shifting; flexible resources; Technology and Engineering;

    Abstract : Capacity shortages in electricity grids can impose significant costs on society due to missed investments in industry. Due to limited profit opportunities and long lead times, grid reinforcements are not a viable solution to the problem, which must therefore be prevented through efficient use of existing grid resources. READ MORE

  4. 4. Simulation of an Electric Quarry with Automated Transporter Scheduling

    University essay from KTH/Optimeringslära och systemteori

    Author : Bilin Chen; Ida Karlsson; [2018]
    Keywords : ;

    Abstract : An electric site project is being developed by Volvo Construction Equipment with the goal to transform the quarry and aggregate industry by reducing carbon emissions by up to 95 % and total ownership cost up to 25 %. The goal is achieved by using electrical autonomous vehicles as the work force. READ MORE

  5. 5. The Incorporation of the Tenant into the Public Construction Project : Through the three parameters of communication; Organisational culture, power and trust

    University essay from KTH/Fastigheter och byggande

    Author : Mia Ahmetasevic; Helena Shamoun; [2017]
    Keywords : Public construction project; communication; organisational culture; power; trust; Offentliga byggprojekt; kommunikation; organisationskultur; status; förtroende;

    Abstract : Public construction projects set the standards for new procedures and perspectives within the industry. A way of improving procedures is through communication and the inclusion of all involved parties. READ MORE